Location
Anticipated completion date
April 2026
Work Begins
Mon. to Fri.
Project Details
Pape & Sons will be replacing 2,500 linear feet of water main in 224th St. beginning January 12, 2026. The work will start at the 38th Ave intersection near Bethel High School and progress eastbound in the 224th roadway to the 46th Ave. E intersection. Numerous leaks have occurred over the years in this section of Southwood’s distribution system. Mainline and service replacements are intended to prevent leaks from occurring in the future and minimize distribution water loss. Additionally, the main will be upsized to a 12-inch diameter pipe increasing fire flow and transmissivity in the east-west direction of the system.
To construct the initial and final tie-ins, water service interruption is anticipated. Notices will be issued to those affected in advance of the outage.
Work will be performed Monday through Friday between the hours of 8 A.M. and 5:00 P.M. Traffic control will be implemented to allow crews to safely work in the area. Emergency vehicle access will be provided throughout all phases of construction; however, residents should plan for extra time and pay attention to where crews are working to allow safe access into and out of driveways and intersections. Please avoid the work area when possible.

Current Projects
-
Final Phase—Ranch Acres Water Mainline Replacement
Location
115th Lane SE and Laukers Lane SEAnticipated completion date
December 2026 -
Corrosion Control Plant, S&I System
Location
72nd Avenue NW between 99th Street Court NW and 98th Street Court NWAnticipated completion date
April 2027 -
Iron, Manganese, & Arsenic Removal System, Foss Rd
Location
22389 Treefarm Ln NE, Poulsbo, WA 98370Anticipated completion date
November 2026 -
Pederson Harold Wellsite and Pumping Upgrades
Location
13818 Purdy Drive NWAnticipated completion date
November 2026