224th St. E Mainline Replacement Construction

Location

10722 View Dr NW
11314 16th Ave Ct

Anticipated completion date

April 2026

Work Begins

Mon. to Fri.

7:00AM to 5:00PM

Project Details

Pape & Sons will be replacing 2,500 linear feet of water main in 224th St. beginning January 12, 2026. The work will start at the 38th Ave intersection near Bethel High School and progress eastbound in the 224th roadway to the 46th Ave. E intersection. Numerous leaks have occurred over the years in this section of Southwood’s distribution system. Mainline and service replacements are intended to prevent leaks from occurring in the future and minimize distribution water loss. Additionally, the main will be upsized to a 12-inch diameter pipe increasing fire flow and transmissivity in the east-west direction of the system.

To construct the initial and final tie-ins, water service interruption is anticipated. Notices will be issued to those affected in advance of the outage.

Work will be performed Monday through Friday between the hours of 8 A.M. and 5:00 P.M. Traffic control will be implemented to allow crews to safely work in the area. Emergency vehicle access will be provided throughout all phases of construction; however, residents should plan for extra time and pay attention to where crews are working to allow safe access into and out of driveways and intersections. Please avoid the work area when possible.

Map of construction area, showing work on 224th Street E between 38th and 46th.

Customer Service Center
(877) 408-4060 [email protected]